Electricity Rates (DPDC)


Electricity Rates (DPDC)

Electricity Rates (DPDC)



Retail Electricity Rate
A. Low Voltage (LT): 230/400 Volt
Electricity Supply: Low Voltage AC Single Phase 230 Volt and Three Phase 400 Volt
Frequency: 50 cycle/second
Approved Demand: Single Phase 0-7.5 KW and Three Phase 0-50 KW

 SL
Customer Category and Slab
New Tariff
Per Unit Rate (Tk.)
Effective from Bill month 1st December, 2017
Demand Charge
(Tk./KW/Month)
1
LT- a: Residential
Life Line: 1-50 Units
3.50
25.00
First Step: From 00 to 75 units
4.00
Second Step: From 76 to 200 units
5.45
Third Step: From 201 to 300 units
5.70
Fourth Step: From 301 to 400 units
6.02
Fifth Step: From 401 to 600 units
9.30
Sixth Step: From 601 to above
10.70
2
LT- b: Agricultural pumping
4.00
15.00
3
LT- c 1: Small Industries
Flat Rate
8.20
15.00
(Applicable for approved demand upto 25 KW)
25.00
(Applicable for approved demand more than 25 KW)
Off-Peak Time
7.38
Peak Time
9.84
4
LT- c 2: Construction
12.00
80.00
5
LT- d 1: Education, religious and charitable organizations and hospitals
5.73
25.00
6
LT- d 2: Street lamp, water pump and battery charging station
7.70
40.00
7
LT- e: Commercial & Office
Flat Rate
10.30
30.00
Off-Peak Time
9.27
Peak Time
12.36
8
LT- t: Temporary
16.00
100.00

B. Medium Voltage (MT):11 KV
Electricity Supply: Medium Voltage AC 11 KV
Frequency: 50 cycle/second
Approved Demand: 50KW to maximum 5MW

 SL
Customer Category and Slab
New Tariff
Per Unit Rate (Tk.)
Effective from Bill month 1st December, 2017
Demand Charge
(Tk./KW/Month)
1
MT-1: Residential
Flat Rate
8.00
50.00
Off-Peak Time
7.20

Peak Time
10.00
2
MT-2: Commercial & Office
Flat Rate
8.40
50.00
Off-Peak Time
7.56
Peak Time
10.50
3
MT-3: Industries
Flat Rate
8.15
50.00
Off-Peak Time
7.34
Peak Time
10.19
4
MT-4: Construction
Flate Rate
11.00
80.00
Off-Peak Time
9.90
Peak Time
13.75
5
MT-5: General Purpose*
Flat Rate
8.05
50.00
Off-Peak Time
7.25
Peak Time
10.06
6
MT- 6: Temporary
15.00
100.00

C. High Voltage (HT):33 KV
Electricity Supply: High Voltage AC 33 KV
Frequency: 50 cycle/second
Approved Demand: 5MW to maximum 30MW (Must be Double circuit for above 20MW)

 SL
Customer Category and Slab
New Tariff
Per Unit Rate (Tk.)
Effective from Bill month 1st December, 2017
Demand Charge
(Tk./KW/Month)
1
HT-1: General Purpose
Flat Rate
8.00
40.00
Off-Peak Time
7.20
Peak Time
10.00
2
HT-2: Commercial & Office
Flat Rate
8.30
40.00
Off-Peak Time
7.47
Peak Time
10.38
3
HT-3: Industries
Flat Rate
8.05
40.00
Off-Peak Time
7.25
Peak Time
10.06
4
HT-4: Construction
Flat Rate
10.00
40.00
Off-Peak Time
9.00
Peak Time
12.50

D. Extra High Voltage(EHT): 132 KV and 230 KV
Electricity Supply: Extra High Voltage AC 132 KV and 230 KV
Frequency: 50 cycle/second
Approved Demand: EHT-1: 20MW to maximum 140 MW (Single or double circuits in technical consideration) ; EHT-2: Above than 140 MW

 SL
Customer Category and Slab
New Tariff
Per Unit Rate (Tk.)
Effective from Bill month 1st December, 2017
Demand Charge
(Tk./KW/Month)
1
EHT-1: General Purpose
Flat Rate
7.95
40.00
Off-Peak Time
7.16
Peak Time
9.94
2
EHT-2: General Purpose
Flat Rate
7.90
40.00
Off-Peak Time
7.11
Peak Time
9.88

Post a Comment

Previous Post Next Post